TURKISH MAPA COMPANY: Dubai Blue Line (UAE)

Author:

Source:

Release time:

2025-11-28

Three units of two-component grout mixing equipment from Fujian Zhongtian provide two-component grout production for the entire metro line.

 

Excavation diameter: 9.61m
Segment O.D.:9.31m
Total Length: 15 km
Grouting Capacity: 24 m³/h (1 unit)
Date: 2025