CCCC TUNNEL ENGINEERING COMPANY LIMITED: Guangzhou Baiyun International Airport Phase III Expansion Underpass Project
Author:
Source:
Release time:
2025-11-28

A ground mixing station with grout transport vehicles was utilized for the project.
Excavation diameter: 11.67m (2 TBMs)
Segment O.D.:11.3m
Total Length: 2.2 km
Grouting Capacity: 30 m³/h
Date: May 2024